$.statelist             Extract time or budget as vectors
WaMaSim                 WaMaSim - Water Management Simulator
costs.per.year          Calculate the total costs per year
do.nothing              Rehabilitation strategy: no pipe replacement,
                        repairs only
expand                  Model expansion of the network
fail                    Model failures of the network
failure.cost            Calculate the (random) cost of a failure
failures.per.year       Calculate number of failures per year
initiate.network        creates the initial network
pipes.built.per.year    Calculate number of newly built pipes for each
                        year
pipes.inservice.per.year
                        Returns the number of pipes in service for each
                        year
replace.more.failures.than
                        Rehabilitation strategy: replace pipes with too
                        many failures
replace.n.highest.risk
                        Rehabilitation strategy: replace the 'n' pipes
                        with the highest risk
replace.n.oldest        Rehabilitation strategy: replace the 'n' oldest
                        pipes
replace.n.random        Rehabilitation strategy: replace 'n' randomly
                        selected pipes
replace.older.than      Rehabilitation strategy: replace pipes older
                        than 'age'
replacement.value       Calculate replacement value
sample.diameter         Sample a diameter of a new pipe.
simulate_network        Simulate the failures, expansion,
                        rehabilitation, and costs of a network
simulate_network.period
                        Simulate the network for a period of time
